Nematron Asia

PROJECTS :: Infrastructures

Shopping Mall

Note
Variable speed drives to control and regulate speed of 7 numbers AHUs. The running speed of AHUs are dependent on tenant usage demand and thus, regulate energy consumption.

Application Controlled Equipments
Environmental & Ventilation Control
Air Handling Units (AHUs)
Infrastructures - Shopping Mall

Wholesale Centre

Note
The facility equipment were controlled by PLC using remote I/O system. Temperature signals from the various coldroom are feedback to the PLC system located in the central control room, to provide optimum control of room temperature. SCADA offers constant monitoring and setting of operation parameters.

Application Controlled Equipments
Coldroom temperature control & monitoring using PLC & SCADA
Chiller Pumps, Temperature Sensors
Infrastructures - Wholesale Centre

Road Tunnel

Note
The facility equipment were controlled by PLC using remote I/O system. The fibre optic remote I/O system offers long distance installation and better noise immunity. This also offer flexibility in upgrading and ease of troubleshooting during commissioning and maintenance.

Application Controlled Equipments
Environmental control & monitoring using PLC
Lightings and Exhaust Fans
Infrastructures - Road Tunnel