HOME
ABOUT US
WHO WE ARE
NEWS & EVENTS
PRODUCTS
PROJECTS
BUILDINGS
TRANSPORTATIONS
INFRASTRUCTURE
PROCESS PLANTS
SYSTEMS
ETHERCAT SYSTEM
NETWORK
CONTACT US
CAREER
PROJECTS :: BUILDINGS
Public Schools
Note
The facility equipment were controlled by PLC using remote I/O system. The 2-wire remote I/O system offer lower installation cost as compared to traditional point-to-point I/o wiring. This also offer flexibility in upgrading and ease of troubleshooting during commissioning and maintenance. HMI installed in the General Office allow the staff to know first-hand any improper operation with the equipment. It also allow the staff to schedule the operation time of the equipment.
Application
Environmental control & monitoring using PLC & touchscreen HMIs
Controlled Equipments
Aircons, Pumps and Lightings
Public Institute
Note
The facility equipment were controlled by PLC using remote I/O system. The 2-wire remote I/O system offer lower installation cost as compared to traditional point-to-point I/o wiring. This also offer flexibility in upgrading and ease of troubleshooting during commissioning and maintenance. SCADA, integration through BACNet, offers constant monitoring and scheduling of equipment operations.
Application
Environmental control & management using PLC & SCADA through BACNET Interface
Controlled Equipments
Aircons, Lightings, Exhaust Fans, Pumps
Tertiary School
Note
The facility equipment were controlled by PLC using remote I/O system. The 2-wire remote I/O system offer lower installation cost as compared to traditional point-to-point I/o wiring. This also offer flexibility in upgrading and ease of troubleshooting during commissioning and maintenance. SCADA offers constant monitoring and scheduling of equipment operations.
Application
Environmental control & monitoring using PLC & SCADA
Controlled Equipments
Lightings, Exhaust Fans and Pumps
WEBMAIL
PRIVACY POLICY
DISCLAIMER
© NEMATRON ASIA. All Rights Reserved.